Job Description:
Installation of rubber wetpour surfacing and synthetic turf surfacing in brand new multi-level Childcare Centre in Oran Park.
A brand-new childcare centre installation, working closely with the Director, Architect and Builder to develop a colour scheme complimentary of the centre’s design and flow.
Our team also conceptualised a unique softfall design around the giant rocket ship play equipment on the ground level, and timber-like scape around the sandpit on the rooftop level. Total installation spanning 1005.7sqm over two levels.
Completed: March 2021